Sykes Cove Community Association

Sykes Cove Community AssociationSykes Cove Community AssociationSykes Cove Community Association
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

  • Home
  • Resident Home Page
  • Contact the Board
  • Documents
  • Architectural Application
  • Realtors Page
  • Survey
  • Special Meeting
  • Culvert and Gazebo Repair
  • More
    • Home
    • Resident Home Page
    • Contact the Board
    • Documents
    • Architectural Application
    • Realtors Page
    • Survey
    • Special Meeting
    • Culvert and Gazebo Repair

Sykes Cove Community Association

Sykes Cove Community AssociationSykes Cove Community AssociationSykes Cove Community Association

Signed in as:

filler@godaddy.com

  • Home
  • Resident Home Page
  • Contact the Board
  • Documents
  • Architectural Application
  • Realtors Page
  • Survey
  • Special Meeting
  • Culvert and Gazebo Repair

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Special Meeting for Culvertt & Gazebo Repairs

Special Meeting: Culvert & Gazebo Repairs

HOA Special Meeting Summary – June 10, 2025, 6:30pm, Zoom (online)
At a special online meeting, the Sykes Cove HOA Board reviewed and voted on proposed repairs to the community’s culvert and gazebo. The culvert, nonfunctional for over 20 years, poses flooding and legal risks, and the Board approved a $20,550 repair contract with J.B. Earth Aquatics, to be funded through 2025 budget savings. The HOA’s strong financial position includes a projected 2025 surplus of over $34,000, with risk mitigation plans in place.  In the event of an overrun or unexpected issues, the board does the reserve the right issue a special assessment.  


The gazebo, requiring partial structural and partial to full floor board repairs, had two options presented, ranging from $9,000 to $17,500, with funding from budget savings and reserves. While the proposed plan for funding the gazebo repair was a phased approach, dependent on actual culvert repair costs, a motion for immediate action was made and failed. Four out of five Board members opted to defer the gazebo repair until post-culvert budget review. Culvert work is scheduled to begin within 4–6 weeks and take three days to complete.


The full proposal presented by the board can be seen below in the special meeting presentation, along witj an executive briefing and the meeting minutes.  Additional documentation is provided  estimates from the selected vendors.

  The image to the right is one of the Sykes Loop Culverts.


Should you have any questions, reach out to HOA@sykescove.com.


Thank you!

Documents

Special Meeting_Presentation_June10 (pdf)Download
Special Meeting_Minutes (pdf)Download
HOA_Executive_Briefing_Culvert_Gazebo (pdf)Download
Culvertt Proposal_from_JB_Earth__Aquatics (pdf)Download
Culvertt_Cove Loop Plat 00350014 (pdf)Download
Culvert Pic (JPG)Download
Gazebo_Proposal (pdf)Download
Gazebo_Florida Dock License (pdf)Download

2024 Sykes Cove Hoeowner Association


Powered by

Welcome Sykes Cove Community Members.

Residents, click the Community Home Page tab and create an Account, and within 24 hours, you will receive an email granting you access to the site.

Create My Account